top of page
Founded 1999 (5).png

MAJOR HOME RENOVATIONS AND ADDITIONS IN KAMLOOPS

Thoughtful Planning for
What Comes Next

Renovating an existing home is rarely as simple as changing what you can see.​​  

Kellermeier Contracting delivers substantial renovations and additions throughout Kamloops and British Columbia’s Interior, with careful attention to the existing structure, building systems, project goals and how the finished space needs to function.​​

IMG_5401.jpeg

RENOVATIONS START WITH WHAT IS ALREADY THERE

Every renovation begins
with an existing building.

That means understanding the structure, layout, mechanical systems, previous work, site conditions and how the property is currently being used before major decisions are made.

​

The earlier Kellermeier is involved, the more opportunity there is to identify potential challenges, review the plans and engineering, and help the project team make informed decisions before construction begins.

​

A well-planned renovation is not just about transforming the finished space. It is about understanding what needs to happen behind it.

SUBSTANTIAL RENOVATION REQUIRE MORE THAN COSMETIC CHANGES 

A renovation should improve how your home works for you

IMG_5846.jpeg

WHOLE-HOME RENOVATIONS 
Substantial changes to the layout, function and finish of an existing home, coordinate across multiple areas and building systems. 

IMG_7506.jpeg

HOME ADDITIONS  
New living spaces designed and constructed to work with the existing home structurally, functionally and visually.  

IMG_5360.jpeg

INTERIOR RECONFIGURATION  
Projects that involve meaningful changes to how a home is laid our and used, including structural and mechanical coordination where required. 

IMG_5075.jpeg

PERFORMANCE UPGRADES 
Renovations that create an opportunity to improve elements of the building envelope, comfort, energy efficiency and long-term performance. 

OUR APPROACH

A successful renovation begins before demolition 

Major renovations require careful planning, strong coordination and clear communication. Our team stays involved from early discussions through construction and handover, with attention to the details that influence how your home performs and ages over time. 

01  Understand the Existing Home

We begin by looking at the property, existing conditions, plans, project priorities and how the home is currently being used.

02  Define the Scope

Major renovations often involve interconnected decisions. Clarifying what is changing, what is staying and what needs further investigation helps establish a more realistic starting point.

03 Bring the Right Team Together

Depending on the project, architects, designers, engineers, consultants and trades may all need to be involved. Kellermeier works with the wider project team so construction considerations are understood early.

04 Prepare for the Unknowns

Existing buildings can reveal conditions that are not visible during early planning. Good preparation cannot eliminate every unknown, but it can help the team identify risks and respond thoughtfully when conditions change.

05 Coordinate the Work

Our team remains closely involved throughout construction, coordinating trades, monitoring workmanship and managing the connections between different phases of the project.

06 Finish for the Long Term

We consider how the renovated home will function, perform and age after the work is complete, not only how it looks at handover.

FEATURE RENOVATION AND ADDITIONS PROJECTS

IMG_9823.jpeg
IMG_5840.jpeg
IMG_5839.jpeg

EAST-SHUSWAP  

IMG_7805.HEIC
Master ensuite.jpg

A renovation can be an opportunity to improve how a home performs 

HIGH-PERFORMANCE RENOVATIONS

Depending on the scope, major renovations can create opportunities to improve building envelope performance, airtightness, comfort, durability and energy use. 

IMG_7825.HEIC

Mountain renovations need their own planning 

RENOVATING IN SUN PEAKS 

Renovating in Sun Peaks introduces additional considerations around climate, access, existing conditions and long-term durability. 

WHY KELLERMEIER FOR RENOVATIONS

Founded 1999 (7).png

RENOVATION QUESTIONS

Common questions about major renovations and additions

When should I contact a contractor about a major renovation? Earlier is generally better. Bringing the contractor into the project while the scope, plans and engineering are still developing can help identify construction considerations before major decisions are finalized.

Do I need finished architectural plans before contacting Kellermeier? No. Kellermeier can begin the conversation while the project is still being developed. Early involvement can be useful when the existing building, structural requirements or construction sequence may influence the design.

What makes a major renovation different from a new build? A renovation has to work with an existing building. That can involve existing structure, mechanical systems, previous renovations, access limitations and conditions that are not fully visible until work begins. The planning process therefore needs to consider both what is being added or changed and what is already there.

Can an addition be designed to feel like part of the original home? That should be one of the goals. Good addition work considers how the new space connects to the existing home in layout, structure, materials, proportions and function. The specific approach will depend on the home and the design.

Can energy efficiency be improved during a renovation? Depending on the scope, yes. Major renovations can create opportunities to improve parts of the building envelope, insulation, airtightness and other elements that influence comfort and energy use. Those opportunities are easiest to evaluate when performance goals are discussed early.

Does Kellermeier complete renovations in Sun Peaks? Yes. Kellermeier is expanding its work in Sun Peaks, including substantial renovations and mountain properties.

Where does Kellermeier complete renovations? Kellermeier Contracting is based in Kamloops and works throughout Sun Peaks, the Southern Interior and North Okanagan. Projects are considered individually based on location, scope, timing and fit.

How long does a major renovation take? There is no single timeline that applies to every project. The size and complexity of the renovation, existing conditions, structural work, engineering, permitting, selections and availability of materials can all affect timing. Kellermeier establishes expectations around the individual project once the scope is better understood.

LET'S TALK ABOUT YOUR PROJECT

Planning a major renovation? 

You do not need to have every decision made before starting the conversation. Tell us about the home, what you are hoping to change and where you are at in the planning process. We can begin by understanding the existing property, the scope and whether Kellermeier is the right fit. 

bottom of page